Design & Build in Dresden, TN

Who do you call when the drawing and the building disagree?

On a traditional project, the answer is complicated. The designer says the plan was clear. The builder says the plan could not be built that way. The owner is in the middle, holding the bill and the phone. Design and build exists to remove that argument by putting the planning and the construction under one roof, so that the person who draws the project is also the person who has to build it.

I am Timothy Parks. I offer design and build for projects in Dresden and across Weakley County, Tennessee: additions, garages, shops, barns, remodels and small buildings. This page explains what the approach is, how a project moves from a conversation to finished work, what you decide at each stage, and where design and build is the right choice and where it is not. If you already know what you want to discuss, my phone line, (407) 383-9118 is the place to begin.

What does design and build actually mean?

In plain terms, it means you hire one party to plan a project and to build it. Instead of paying a designer to draw something, then taking the drawings to several builders for prices, then discovering that the design cannot be built within your budget, you work with me from the first sketch to the last coat of paint.

That does not mean I do everything with my own hands. Some work is done by specialists, such as electrical, plumbing and heating and cooling, and I bring them in and coordinate them. It means that I am responsible for how the pieces fit together, and you have a single point of contact when something needs an answer.

QuestionSeparate designer and builderDesign and build
Who do I talk to?Two parties who may not talk to each otherMe, from start to finish
Who checks the design against the budget?You, usually after the drawings are doneMe, while the design is still being shaped
Who answers if the plan cannot be built as drawn?It depends on who you askMe
How are changes handled?Among three partiesBetween you and me, in writing

How does a project start?

It starts on the ground, not on paper. I want to stand on the site with you. What is the lot like? Where does the water go? Where do the sun and the prevailing wind come from? What is already built, and what is its condition? What do the neighbors see? What do you wish the building would do that your current one cannot?

Then comes the conversation about budget and priorities. I do not publish prices, so I cannot hand you a number off a website, but I do ask what range you are working within and what you would give up first if the figure came back higher than hoped. That conversation shapes the design from the start. A project with a clear budget gets a design that fits it. A project with no budget gets a design that gets cut later.

Finally, I ask about use. Who lives or works in the building? How will it change in ten years? Do you want room to grow? Are there things you would regret leaving out? Good design begins with understanding the life that will happen inside the building, not with the shape of the walls.

What are the stages of design?

Design is not one event. It is a series of decisions, made in an order that avoids rework. Here is how I usually structure it.

  1. Concept. A rough sketch, a rough footprint and a discussion of what the building is for. This is where you can change your mind cheaply.
  2. Layout. Room sizes, doors, windows, how people move through the space and where the structure and utilities fall.
  3. Structure and systems. Foundation type, framing method, roof shape, and how electrical, plumbing and heating and cooling will work.
  4. Materials and finishes. Roofing, siding, windows, flooring and fixtures, chosen with an eye on durability and cost.
  5. Drawings and scope. The documents that describe what will be built, detailed enough for permits where required and for the work itself.

At each stage I show you what I am thinking and ask for your response before moving on. Changes are far easier on paper than in framing, so I encourage you to take your time with the early stages. If a stage is not settled, I do not rush to the next one.

What happens between design and groundbreaking?

A good design is not a building yet. Between the drawing and the first shovel sit several steps that determine whether the project goes smoothly.

Permits and approvals. Many projects need permits from the city or county, and some need zoning review or other approvals. What is required depends on where the property is and what is being built. I tell you what I understand the requirements to be and I recommend that you confirm with the office that serves your address. I cannot say how long any office will take, because that is beyond my control.

Utilities and site checks. Locating underground lines, confirming septic and well locations, and checking property lines. Mistakes here are among the most expensive.

Site preparation. Clearing, grading, drainage and access. See brush clearing and site work.

Ordering and scheduling. Long-lead materials such as windows, doors, trusses and specialty roofing may take time to arrive. I order them in a sequence that supports the work and does not leave a half-built shell waiting for a delivery.

The contract. A written agreement that describes the scope, the materials, how changes are handled and when payments are due. I do not ask for money before you have a contract you have read, and I encourage you to take it to someone you trust before you sign.

How do I keep the project on track once it is under way?

I do not promise exact dates, because weather, deliveries and inspections shape every schedule. What I do is manage the work so that delays are minimized and communicated early.

I schedule trades in the order that keeps each stage from damaging the next. I check the work against the drawings before it is covered. I keep a record of what was built, with photographs of the hidden parts, because what is inside the wall is the part nobody sees again. I handle the daily problems that come up on any site: a delivery on the wrong day, a measurement that does not match, a utility that is not where the sketch said it would be.

When something affects the schedule, the price or the design, I tell you. Not a week later, and not at the end. The details of that coordination work are explained further under project management.

When is design and build the right choice, and when is it not?

I believe in being honest about fit. Design and build suits many projects, but not all.

It suits homeowners who want a single point of responsibility, projects where the budget is a real constraint, jobs with unclear scope that need to be shaped as they go, additions and remodels where the design depends heavily on what exists, and outbuildings, shops and barns where function matters more than architectural detail.

It may not suit projects that need an architect or engineer for approval or complexity, or that involve a design so specialized that a dedicated designer will give you more than I can. In those cases I am happy to build from someone else's drawings, and I will tell you if I think a particular design needs a professional I am not.

Some owners also prefer to keep design and construction separate so that they can compare builder prices on the same drawings. That is a reasonable choice. If you go that way, I will still look at your drawings and give you a written scope and price for the build.

How does design and build connect to the rest of what I do?

Because I also do the roofing, framing and finishing, I can think about the building as a whole rather than a series of trades. A new roofline affects the existing roof. A new bathroom affects the plumbing, the floor framing and the ventilation. A new garage affects drainage and the driveway. When the same builder sees all of this, fewer things fall between the cracks.

Many projects begin in one place and end in another. A homeowner calls about a leaking roof, and we discover that the addition they have wanted for years would solve a different problem and require a new roof anyway. Another calls about a barn and ends up with a shop that includes an office. Design and build lets those conversations happen naturally.

Related pages include construction, additions, garages and remodeling. For the roof side of any project, see roof replacement.

What should you bring to the first conversation?

You do not need to arrive with drawings. These items help, though.

If you are not sure where to start, just describe what is frustrating you about the way things are. The best designs begin with a problem. Send your description through my phone line, (407) 383-9118, and I will call you back.

How do I keep the design inside your budget?

Most design regrets are budget regrets. A project is drawn without a number in mind, priced later and then cut down until little of the original idea is left. I try to avoid that sequence by keeping the budget in the room from the first meeting.

As the design develops, I tell you which choices drive effort and risk. Roof complexity, foundation type, the number of plumbing fixtures, the amount of exterior wall, the number of windows and the height of the building all affect the size of the job. Interior finishes are the flexible part and can often be upgraded later. If a choice is cheap now and expensive later, such as running a conduit or leaving blocking in a wall, I tell you so you can decide.

When you have to cut something, I help you cut the right thing. A common example: owners trim square footage to save money, when a simpler roofline or a more efficient layout would save more without losing usable space. Another: choosing a premium finish in a room that will be rarely seen, while skimping on the weather barrier that protects the whole wall. I would rather steer you toward spending where it protects the building.

I do not post prices on this site because a figure without a project is a guess. What I offer is a written price tied to a written scope, with exclusions and conditions listed, so you can see what drives it.

Which specialists do I bring in, and how do I manage them?

Some parts of a project belong to specialists. Electrical systems, plumbing, heating and cooling, concrete finishing and certain kinds of roofing are examples. I coordinate them rather than leaving you to find and schedule each one.

That coordination matters more than it sounds. The electrician needs to know where the wall is going before it is framed. The plumber needs the slab to be ready, but not poured. The roofer needs the framing to be square and the decking to be dry. When trades arrive out of order, work gets torn out and redone. I set the sequence, make sure each trade knows what the one before it did, and check the result before the next one covers it.

Where a trade requires a particular qualification under Tennessee rules, I use someone who can properly do that work, and I do not ask you to accept a shortcut. If you have a specialist you already trust, tell me, and we can discuss whether to use them.

What mistakes do I see when owners design alone?

People who have lived in a house for years often know exactly what annoys them. That is useful knowledge, and I welcome it. But designing a building from the inside out has predictable traps.

None of this is a criticism. These traps catch professionals too. The value of talking through a design before it is final is that each of them can be caught on paper.

What will you have in hand when the design is done?

By the end of the design stage you should hold a set of documents you understand: a drawing of the layout, a description of the structure and materials, a written scope and a written price. You should be able to read them, ask questions about any line and know what each decision means for the building. If something is unclear, it is my job to explain it, and I would much rather answer a question now than a complaint later.

Nothing is built until you have had the chance to review all of it and say yes. That is the point of having a design stage at all.

Which credentials do I hold?

These are the credentials I hold, listed as issued. They are Florida credentials, listed as facts about me and not as a statement about any other state.

Ask me what any of them covers and I will tell you plainly.

Common questions

What is design and build?

It is an arrangement where one party plans a project and builds it. You work with me from the first sketch through the finished building, instead of coordinating a separate designer and builder.

Do I need drawings before I call?

No. A description, a few photos and an idea of your budget are enough. I develop the concept with you, and you approve each stage before I move on.

Do you handle permits?

Where permits are required, I help prepare for them and schedule inspections. Requirements depend on the address and the work, so I tell you what I understand them to be and recommend you confirm with the local office.

Can I use my own plans?

Yes. I will look at them and give you a written scope and price. If a design needs an architect or engineer, I will say so.

Will you tell me the price before I commit?

Yes. I give a written price tied to a written scope. I do not post prices on the site because they depend on the project, and I explain what is included and what is not.

What if I want to change something mid-project?

Tell me. I explain how the change affects the work and the price, and I put it in writing before anything is done.

Request a quote(407) 383-9118